PCN DSG-COM/03/145

Features: SpecificationsDescription The PCN DSG-COM/03/145 type of the change is a Package assembly process change for the reason of environment directive. For changing lead from plating in the way of using preplating nickel palladium gold leadframe NiPdAu. ELECTRICAL & MECHANICAL parameters w...

product image

PCN DSG-COM/03/145 Picture
SeekIC No. : 004456801 Detail

PCN DSG-COM/03/145: Features: SpecificationsDescription The PCN DSG-COM/03/145 type of the change is a Package assembly process change for the reason of environment directive. For changing lead from plating in the way ...

floor Price/Ceiling Price

Part Number:
PCN DSG-COM/03/145
Supply Ability:
5000

Price Break

  • Qty
  • 1~5000
  • Unit Price
  • Negotiable
  • Processing time
  • 15 Days
Total Cost: $ 0.00

SeekIC Buyer Protection PLUS - newly updated for 2013!

  • Escrow Protection.
  • Guaranteed refunds.
  • Secure payments.
  • Learn more >>

Month Sales

268 Transactions

Rating

evaluate  (4.8 stars)

Upload time: 2024/11/23

Payment Methods

All payment methods are secure and covered by SeekIC Buyer Protection PLUS.

Notice: When you place an order, your payment is made to SeekIC and not to your seller. SeekIC only pays the seller after confirming you have received your order. We will also never share your payment details with your seller.
Product Details

Description



Features:






Specifications






Description

      The PCN DSG-COM/03/145 type of the change is a Package assembly process change for the reason of environment directive. For changing lead from plating in the way of using preplating nickel palladium gold leadframe NiPdAu. ELECTRICAL & MECHANICAL parameters won't be affected by the change. Samples LM393DT/LM358DT and Other samples such as on request are available.  YOUR SAMPLE ORDER CAN BE BOOKED IN NON-STANDARD AS THE FOLLOWING COMMENT "AS PER LEADFREE PCN DSG-COM/03/145".
      The forecasyed date of change of PCN DSG-COM/03/145PCN DSG-COM/03/145 is 07-May-2003, The frecasted date of samples for customer is 07-Feb-2003 and the forecasted date for STMicroelectronics change qualification report availability is 07-Feb-2003.
      There are some changes of PCN DSG-COM/03/145 between the new process and current. The assembly flow + Control Plan of new one is 7124337 while the current one is 7071671. Frame (material) of new one is Copper + NiPdAu preplating while the current one is Copper, Die attach material of new one is CMP8000 CH4 then the current one is MP8000 CH4 and the lead finishing of new one is NiPdAu(preplated) then the current one is Tin plating (SnPb85/15).There are no diffrence in the aspects of the assembly site(ST Muar (Malaysia)), Wire material (Gold),Wire diameter (I MIL), mold compound (MP8000 CH4) and Wire bond method (Thermosonic).






Customers Who Bought This Item Also Bought

Margin,quality,low-cost products with low minimum orders. Secure your online payments with SeekIC Buyer Protection.
Audio Products
Memory Cards, Modules
Static Control, ESD, Clean Room Products
LED Products
RF and RFID
View more