DIN Rail Power Supplies
SeekIC Buyer Protection PLUS - newly updated for 2013!
268 Transactions
All payment methods are secure and covered by SeekIC Buyer Protection PLUS.
The features of MDR-40 series(40W single output industrial din rail power supply) are Universal AC input/Full range, Protections: Short circuit / Overload / Over voltage, Cooling by free air convection, Can be installed on DIN rail TS-35/7.5 or 15, NEC class 2 / LPS compliant (12V,24V,48V only), LED indicator for power on, DC OK relay contact, No load power consumption<0.75W, 100% full load burn-in test, 3 years warranty.
The output of MDR-40-5 are DC voltage(5V), rated current(6A), ripple &noise(80mVp-p), voltage adj. range(5~6V), voltage tolerance(2.0%), line regulation(1.0%), load regulation(1.0%), setup, rise time(500ms, 30ms/230VAC, 500ms, 30ms/115VAC at full load), hold up tim ( 50ms/230VAC, 20ms/115VAC at full load).
The intput of MDR-40-5 are voltage range(85~264VAC, 120~370VDC), frequency range(47~63Hz), efficiency(78%), AC current(1.1A/115VAC, 0.7A/230VAC), inrush current(COLD start 30A/115VAC, 60A/230VAC), leakage current(<1mA /240VAC).
The output of MDR-40-12 are DC voltage(12V), rated current(3.33A), ripple &noise(120mVp-p), voltage adj. range(12~15V), voltage tolerance(1.0%), line regulation(1.0%), load regulation(1.0%), setup, rise time(500ms, 30ms/230VAC, 500ms, 30ms/115VAC at full load), hold up tim ( 50ms/230VAC, 20ms/115VAC at full load).
The intput of MDR-40-12 are voltage range(85~264VAC, 120~370VDC), frequency range(47~63Hz), efficiency(86%), AC current(1.1A/115VAC, 0.7A/230VAC), inrush current(COLD start 30A/115VAC, 60A/230VAC), leakage current(<1mA /240VAC).(notes:1. All parameters NOT specially mentioned are measured at 230VAC input, rated load and 25 of ambient temperature.2. Ripple & noise are measured at 20MHz of bandwidth by using a 12" twisted pair-wire terminated with a 0.1uf & 47uf parallel capacitor.3. Tolerance : includes set up tolerance, line regulation and load regulation.4. The power supply is considered a component which will be installed into a final equipment. The final equipment must be re-confirmed that it still meets EMC directives.5. Length of set up time is measured at first cold start. Turning ON/OFF the power supply may lead to increase of the set up time.)