Published:2009/7/15 3:03:00 Author:Jessie | From:SeekIC
Switch is normally closed, charging C and blocking scs.Delay is initiated by opening switch. After delay interval, determined by R, Q, and potenliometer, silicon controlled switch conducts on altenate half-cycles. Transistor Manual, Seventh Edition, General Electric Co., 1964, p 435.
Reprinted Url Of This Article:
http://www.seekic.com/circuit_diagram/Basic_Circuit/A_C_OPERATED_TIME_DELAY.html
Print this Page | Comments | Reading(3)
Code: